EV Charging and 3-Level Basement Parking at Prestige Grove Park Explained

Featured Image of EV Charging and 3-Level Basement Parking at Prestige Grove Park Explained


Prestige Grove Park plans three basement levels with about 1,450 car parking bays for its 1,500 homes. That works out to nearly one parking bay per home, which is rare in a dense Mumbai suburb. Over 150 bays will come with electric vehicle charging points, so EV owners can charge at home overnight. The basements also hold visitor parking bays, which keeps guest cars off the internal roads. With cars moved below ground, the surface stays free for gardens, courtyards and safe walking paths.

Parking at a Glance


Particular Details
Basement Levels 3
Total Car Bays About 1,450
Total Homes 1,500
Parking Ratio Nearly 1 bay per home
EV Charging Points Over 150
Visitor Parking Dedicated visitor bays
Towers Served 6 towers of 45 to 50 floors

Why Basement Parking Matters in Mumbai


Parking is one of the biggest daily headaches for families in Mumbai. Older buildings in Borivali often have space for only a few cars, so residents park on the street. That leads to scratched cars, towing fines and fights over spots.

A three-level basement solves this at the design stage. It keeps every car under one roof, safe from rain, sun and street traffic. It also frees the ground for green space, so about 35% of the land stays open.

How the 3-Level Basement Works


Each basement level sits below the towers and the open landscape above. Ramps connect the levels to the entry and exit points of the township. Lifts from every tower run down to the basements, so you can reach your car without stepping outside.

This layout gives you three clear benefits in daily life.

  • You walk from your car to the lift lobby under cover, even in heavy monsoon rain.
  • Your car stays shaded, which protects the paint and keeps the cabin cool.
  • Kids and elders walk on the ground level without cars moving around them.

EV Charging: What 150+ Points Mean for You


With over 150 EV points, about one in ten bays will be ready for an electric car. As more Mumbai families switch to EVs, this setup saves you the trouble of getting society approval later. Many older societies still argue over who pays for chargers and power lines.

Here is a simple view of how home EV charging works for most buyers.

Charger Type Typical Use Approx. Time to Charge
AC home charger (7 kW class) Overnight charging in your own bay About 6 to 8 hours for most city cars
DC fast charger Quick top-ups on longer trips Under an hour for a large share of the battery

Charge times vary by car model and battery size. Confirm the charger type at each bay with the builder.

For most city driving, an overnight charge in your own bay covers a full week of office trips. That means you rarely need to visit a public charging station.

EV Charging Costs and Billing


Before you book, ask how the society will bill EV charging to each owner. Some projects fit a separate meter at each charging bay, so you pay only for what you use. Others use a smart system that tracks units through an app and adds them to your maintenance bill.

A separate meter or smart billing keeps things fair between EV owners and other residents. It also avoids disputes at society meetings later.

Parking Allotment: What to Ask


The number of bays per home matters less than how the builder allots them. Ask these questions before you sign your agreement.

  • How many car bays come with a 2 BHK and with a 3 BHK?
  • Can you buy an extra bay, and at what cost?
  • Which basement level will your bay be on?
  • Will your bay have an EV charger, or can you request one?
  • Is the bay covered and stack-free, or is it a mechanical stack?
  • How will guests book the visitor bays, and are there time limits?

Safety Features to Check in the Basements


Basements in Mumbai need to handle monsoon rain and fire safety rules. These are the key features you should ask about.

  • Proper drainage and pumps to keep water out during heavy rain.
  • Mechanical ventilation to clear exhaust fumes from all three levels.
  • Fire sprinklers and smoke detectors across every basement level.
  • Bright lighting and CCTV coverage at ramps, lifts and corners.
  • Clear signs, one-way traffic lanes and speed breakers on ramps.
  • A separate fire-safe area around the EV charging bays.

Prestige Group has built many large townships with multi-level basements, so these systems are standard for the brand. Still, check the final specs once the MahaRERA plans are public.

How Parking Adds to Your Home's Value

A confirmed parking bay adds real value when you sell or rent your home in Borivali. Tenants and buyers often skip flats without parking, especially families with a car. EV-ready bays will matter even more by 2031, when possession is due and more cars are electric.

FAQs


1. How many parking bays does Prestige Grove Park have?

The project plans about 1,450 car bays across three basement levels. That gives nearly one bay for each of the 1,500 homes. Visitor bays are planned on top of this count.

2. Does Prestige Grove Park have EV charging?

Yes, the project plans over 150 EV charging points in its basements. That means about one in ten bays will be ready for an electric car. Ask the sales team whether your bay can get a charger.

3. How long does it take to charge an EV at home?

A 7 kW class AC home charger fills most city EVs in about 6 to 8 hours. So you can plug in at night and leave with a full battery in the morning. Actual time depends on your car's battery size.

4. Is the basement parking safe during Mumbai monsoons?

Well-built basements use drainage lines, pumps and ramp design to keep water out. Prestige builds multi-level basements across its large townships. Still, ask about the drainage and pump plan for this project before you book.

5. Will each home get its own parking bay?

With about 1,450 bays for 1,500 homes, most homes can expect one bay. The final allotment depends on your home type and the builder's policy. Confirm your bay count in writing in the sale agreement.

6. How is EV charging billed in a housing society?

Most new projects use either a separate meter at each EV bay or a smart billing system. Both ways make sure you pay only for the power you use. Ask the builder which system this project will use.

Enquiry
Enquire Now